01
Environmental Consultancy and Environmental Management
While production continues, waste records, environmental measurements, notifications and permit conditions need to be followed regularly. Within the scope of environmental consultancy, we review on-site practices together with existing documents, identify gaps and plan the work to fit the company’s operating routine.
Segregating hazardous and non-hazardous waste at source, organising temporary storage areas and keeping waste records are the main topics of this work. For wastewater, emissions and environmental noise, we examine the impacts arising from the facility’s activities and any existing measurement results to define the steps to follow.
02
EIA Processes and Investment Consultancy
When planning a new facility, a capacity increase or a change to a production line, it is important to include the Environmental Impact Assessment (EIA) process in the investment schedule early. The project’s location, capacity, production method and interaction with the environment determine the scope of the assessment.
At Proçev, we support investors in assessing the EIA scope of the project, compiling the required technical information and planning the preparation of the file. We address topics such as water use, waste generation, air emissions and environmental noise according to the characteristics of the project, and help reflect the measures for the foreseen environmental impacts in the investment plan.
03
Environmental Permits and Licences
In environmental permit and licence work, we examine the facility’s field of activity, existing documents and technical infrastructure together. We advise the company from identifying the information, documents and measurements required for the application to preparing the file and following up the process.
When production capacity, fuel type, equipment or field of activity changes, existing permits and environmental obligations may need to be reassessed. We help companies address such changes at the planning stage and determine the necessary actions on time.
04
Emissions, Wastewater and Environmental Noise
Planning a measurement starts with determining which source will be assessed under which operating conditions. We evaluate stack emission, wastewater analysis and environmental noise measurement needs according to the facility’s activities. Where required, we support coordination with accredited laboratories, measurement preparations and the interpretation of results for the business.
Measurement results help monitor environmental performance and identify points that need improvement. For example, the effect of a change in production conditions on emission values can be tracked through measurements taken under appropriate conditions.
05
Industrial Risks and Chemical Management
In facilities that use or store chemicals, the type, quantity and method of use of the substances affect the risks and obligations to be assessed. Depending on the facility’s needs, we provide consultancy on Seveso (BEKRA) notifications, chemical risk assessment, ADR processes for the transport of dangerous goods and the Explosion Protection Document.